Saturday, February 6, 2016

The leaning (water) tower of Hawera



Reaching Hawera on a recent weekend trip with the committee of the NZ History Federation, during a petrol stop there, I looked around, and asked what the prominent landmark was, visible just along the road. When I was told it was the Hawera Water Tower -- I knew I wanted to take photos and find out more. So, the next morning, before the sun started baking us alive again from 9 am down there -- I set off on a wee walk from the motel, headed for the tower.



 

Built in 1913, it provided the needed pressure for Hawera's water supply so the settlement's folks could combat fires there. In the same month it opened, January 1914, a sudden earthquake caused the tower to list 2.5 feet to the south. Naturally, people were worried the whole thing was going to fall over, but the local council sorted it by anchoring with reinforced concrete, filling the tanks, then undermining and pouring more reinforced concrete. The lean was reduced to 3 inches.





The tower was made redundant later in the century, and became a tourist viewing platform, accessible by obtaining a key from the nearby i-Site for a small fee. However, large chunks of concrete fell off in 2000, and the tower was closed indefinitely. Public consultation in 2001 came out in favour of retaining the tower, and major renovation and restoration work was completed in 2004. Then, of course, we had the Canterbury quakes -- so the tower was closed to the public again.




The good news is that the structure itself is safe enough, but work is still needed to fully strengthen parts of it. "The water tower itself was safe but eight balustrades on the structure needed strengthening. It's a relatively minor fix and cost compared to what it could have been if the tower itself was found wanting," [South Taranaki District Council engineering services group manager Brent Manning] said. As the tower was a considered a category one heritage building under Historic Places Trust classification, Manning believed the process would take slightly longer but should be finished within the next few months. "I have no idea of that cost but I expect it to be possibly less than the cost of all the investigations we've done to date but nonetheless, at least we know the answers now." (Taranaki Daily News, 13 August 2015)

So, until work is done, and the keep out signs and the orange plastic hazard fencing are removed -- the only ones enjoying the views are the pigeons.




More info: 


Heritage image: Taranaki Stables. Water tower, Hawera. Radcliffe, Frederick George, 1863-1923 : New Zealand post card negatives. Ref: 1/2-006028-G. Alexander Turnbull Library, Wellington, New Zealand. 

From Wellington to Auckland at speed - 1923



NEW MOTOR RECORD.
WELLINGTON TO AUCKLAND
TIME: 15 HOURS 25 MINUTES
JOURNEY THROUGH RAIN

A new motor-car speed record between Auckland and Wellington was established yesterday by Mr George L Campbell and Mr Leslie F Bedford. The car, a Durant Four, left Wellington at 3 am, and drew up outside the general post office at Auckland at 6.25 pm, after a trip of 15 hours 25 minutes, which is 42 minutes better than the time taken by the previous holder of the record, Mr W S Miller, who did the journey in a Chandler car. Progress telegrams had been received in Auckland during the day and the car was expected shortly after six o'clock, at which time a large crowd of people, including the Mayor, Mr J H Gunson, and officials of the Auckland Automobile Association had gathered in the vicinity of the post office.

As soon as the car stopped, it was rushed by a cheering crowd, and the record-breakers were accorded a flattering reception. When Mr Gunson could get near the car he congratulated Messrs Campbell and Bedford on their fine performance, and welcomed them on behalf of Auckland. Messages brought from Wellington were delivered, and the car, with the Mayor at the wheel, was taken to the garage, while Mr Campbell was carried shoulder-high along the street.

Mr Campbell said that before the trip was commenced all particulars regarding the car and the names and addresses of Mr Bedford and himself were taken by the police. On Saturday he saw Inspector Mcllveney, of Wellington, who warned him of the risks he was taking regarding breaches of speed-limit laws. Mr Campbell replied that it was his intention to observe all by-laws when passing through towns, and that was done. The start was made at 3 am, cars accompanying the Durant, which is owned by the Campbell Motors Ltd, as far as Petone. As the Aucklanders did not know the road to Wanganui very well, Mr Ben Campbell, of Wellington, drove that far. A storm was raging on Paekakariki Hill, but the motorists kept on and reached Hawera shortly after eight o'clock. Rain fell 'till Mount Messenger was reached, while birds proved dangerous, as the car had no windscreen. Unfortunately, a wheel struck a stone, which flew up and pierced the petrol tank, making it extremely difficult to keep up the pressure of benzine.

The river at Mokau was safely crossed by punt at 11.30 am, and here the hole in the tank was soldered by Public Works Department employees. At Uruti the flooring of a wooden bridge was being taken up, and there were just enough planks left for the car to cross. Had the car arrived a little later at the bridge, a delay of several hours would have been inevitable.

The roads were good for the first 300 miles, but the Taumatamaire Hill, the worst road experienced on the trip, was passed over in pouring rain. "We expected that we would have to give it up here," said Mr Campbell, "the road was in such a dreadful state. At Piopio, Te Kuiti, cars met and escorted us to the town, where we arrived at 2.50 pm. It was still pouring with rain, but cleared when we were half-way between Te Kuiti and Hamilton, which we reached at 3.45 p.m. At Ngaruawahia we were offered ropes to help us over the Rangiriris, but we did not use them as the surface was only slippery. We had no punctures and never used chains."

A feature of the trip, said Mr Campbell, was the amazing interest taken by people all along the route. At every township, people simply crowded the street and gave the motorists a great reception. The whole township turned out at Te Kuiti, and the police had to keep back thousands of people at Hamilton. Policemen were posted at every town passed through, but no one stopped the car. Local residents were ready with refreshments wherever a halt was made, and there was no difficulty in obtaining benzine and oil for the engine. The total distance covered was 481 miles. Cars from Auckland met the Durant at Manurewa.

The motorists brought a military despatch for the headquarters of the Northern Command and messages for the Mayor and the harbourmaster, Captain H H Sergeant.

(NZ Herald 15 March 1923)

Image Auckland Weekly News 22 March 1923, AWNS-19230322-46-6, Sir George Grey Special Collections, Auckland Libraries